top of page

NextStoneâ„¢ Installation Guides 

You will need to have Adobe Reader installed to view these pdf files. If you don't have Adobe Reader installed on your computer, you can download it for free by clicking here.

Full Installation Manual

Installation manual

for all NextStone™

products.

(Faux Wood Beams and River Rock Panel Installation not included in Full Installation Manual. Please see below.)

Illustrated Install

A more comprehensive

presentation illustrating

the easy install process. 

​

 

2pc  Slatestone Post Cover Installation

 

Install Basics

While Polyurethane has minimal expansion and contraction, all products must be allowed to acclimate 48 hours minimum prior to installing. 

 

Never leave cut edges of NextStoneâ„¢ exposed as the Polyurethane will discolor with exposure to sunlight. Use Touch Up Paint to cover cut edges.

 

Quality deck screws or stainless steel screws are recommended with a minimum of 6 screws per panel. 

 

Adhesive is NOT required for installation. PL Premium Construction Adhesive is recommened if adhesive is used.

 

NextStoneâ„¢ panels can be installed onto any substrate including concrete and brick. Concrete screws and pre-drilled holes are recommended.

 

4' Metal Starter Strips are needed to begin the first course/row of panels. 

Stone siding

2pc  Country Ledgestone  Post Cover Installation

 

Post Cover Cap Light Kit Installation

 

30" Inch Slatestone Column Wrap 

 

Metal Building Install 

When installing on metal buildings, a backer board can be used as a sold substrate to allow all screws to attach properly.

 The backer board or OSB should be at minimum ½" thick. This board needs to be attached securely to the building using a construction adhesive and screws. It may be necessary to bolt the screws down to avoid the panels and/or backerboard pulling away from the corrugated siding.

 Use appropriate weather proof substrate or sheathing as per local codes. Then proceed as per normal installation instructions.

Interested in being listed as an official NextStone™ Installer or Contractor? Submit your information below to be added to our website!

Your details were sent successfully!

If you are unable to find the information you need, you can contact our corporate office at

303-371-8232 or send us an email through the Contact tab

where a NextStone™ representative will be happy to assist you. 

bottom of page