Full Installation Manual

Installation manual

for all NextStone™

products.

(Faux Wood Beams and River Rock Panel Installation not included in Full Installation Manual. Please see below.)

Illustrated Install

A more comprehensive

presentation illustrating

the easy install process. 

1pc Post Cover Installation

 

2pc Post Cover Installation

 

Install Basics

While Polyurethane has minimal expansion and contraction, all products must be allowed to acclimate 48 hours minimum prior to installing. 

 

Never leave cut edges of NextStone™ exposed as the Polyurethane will discolor with exposure to sunlight. Use Touch Up Paint to cover cut edges.

 

Quality deck screws or stainless steel screws are recommended with a minimum of 6 screws per panel. 

 

Adhesive is NOT required for installation. PL Premium Construction Adhesive is recommened if adhesive is used.

 

NextStone™ panels can be installed onto any substrate including concrete and brick. Concrete screws and pre-drilled holes are recommended.

 

4' Metal Starter Strips are needed to begin the first course/row of panels. 

Post Cover Cap Light Kit Installation

 

30" Inch Slatestone Column Wrap 

 

Faux Wood Beam

 

Metal Building Install 

When installing on a steel building, a backer board should be used so that all required attachment points have a secure backing.

 

This is necessary because the recessed rails of the corrugated steel panels often fall in areas where panels or accessories need to be securely fastened.

 

The substrate should be a backer board or OSB of at least ½" thick. This board needs to be attached securely to the building using a construction adhesive and screws.

 

Use appropriate whether proof substrate or sheathing as per local codes.

 

Then proceed as per normal installation instructions.

River Rock Panel 

 

Interested in being listed as an official NextStone™ Installer or Contractor? Submit your information below to be added to our website!

If you are unable to find the information you need, you can contact our corporate office at

1-866-371-8232 or use the online chat feature

where a NextStone™ representative will be happy to assist you. 

U.S. PAT. NO. 7,748,183.

© 2019 by NextStone, LLC.